维普中文期刊产品整合服务
10篇 您的检索式:作者名="Shrub"
    题名 作者 年代 出处 被引量
1Estimating the cost of steel pipe bending, a comparison between neural networks and regression analysis显示文摘Avraham Shrub Ronen Versano 1999Int J Production Economics1999,62,3:1
2The stochastic time-cost tradeoff problem: A robust optimization approach 显示文摘Cohen I Golany B Shrub A 2007Networks2007,49,2:1
3Sequencing mixed-model assembly lines to level parts usage and minimize line length显示文摘Bard J F Shrub A Joshi S B 0,,:1
4Multi-Project scheduling and control: A Process-based comparative study of the critical chain methodology and some alternatives 显示文摘Izack Cohen Avishai Man- delbaum Avraharn Shrub 2004Project Management Joumal2004,,6:1
5Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm显示文摘Avraham Shrub Larry J LeBlanc Ziyong Cai 1996European Journal of Operational Research1996,88,1:1
6Model for Cost Estimation in a Finite-capacity Stochastic Environment Based on Shop Floor Optimization Combined with Simulation 显示文摘Mark Eklin Yohanan Arzi Avraham Shrub 2008European Journal of Operational Research2008,,4:1
7A neural-network-based approach for estimating the cost of assembly systems 显示文摘Shrub A Zimerman Y 1993Intemational Joumal of Production Economics (S0925-5273)1993,32,2:1
8Project segmentation-a tool for project management 显示文摘Avraham Shrub 1997International Journal of Project Management1997,15,1:1
9An Analytic Framework for Sequencing Mixed Model Assembly Lines显示文摘Bard J F Dar--El E M Shrub A 1992International Journal of Production Research1992,30,1:1
10Estimating the Progress of Projects显示文摘Globerson Shlomo Shrub Avraham 1995Engineering Management Journal1995,,7:1
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费