维普中文期刊产品整合服务
13篇 您的检索式:作者名="SEGERSTEDT A"
    题名 作者 年代 出处 被引量
1Inventory control with a modified croston procedure and Erland distribution 显示文摘Leven E Segerstedt A 2004International Journal of Production Economies2004,,90:1
2Effects of carbon emis- sion regulations on remanufacturing decisions with limited information of demand distribution 显示文摘Liu B Y Holmbom M Segerstedt A 2015International jour- nal of production research2015,53,2:1
3Inventory control with a modi- fied Croston proceduew and Erlang distribution 显示文摘LEVIN E SEGERSTEDT A 2004Interna- tional Journal of Production Economics2004,90,3:1
4Inventory control with a modified croston procedure and Erlang distribution显示文摘Leven E Segerstedt A 2004International Journal of Production Economics2004,90,:1
5A new heuristic to solve the one-warehouse Nqretailer problem显示文摘Abdul-Jalbar B Segerstedt A Sicilia J 2010Computer & Operations Research2010,37,:1
6Multi-product economic lot scheduling problem with manufacturing and remanufac?turing using a basic period policy显示文摘Zanoni S Segerstedt A Tang 0 2012Computers and Industrial Engineering2012,62,:1
7Inventory control with a mod- ified Croston procedure and E,'lang distribution 显示文摘LEVIN E SEGERSTEDT A 2004Inter- national Journal of Production Economics2004,90,3:1
8Inventory control with a modified croston procedure and Erlang distribution 显示文摘Leven E Segerstedt A 2004International Journal of ProductionEconomics2004,90,:1
9Inventory Control with a Mod- ified Croston Procedure and Erlangdistribution 显示文摘LEVEN E SEGERSTEDT A 2004Interna- tional Journal of Production Econormics2004,90,3:1
10Lot Sizes in a Capacity Constrained Facility with Available Initial Inventories显示文摘 1999International Journal of Production Economy1999,59,3:1
11Inventory control with a modified croston procedure and Erlang distribution显示文摘Leven E Segerstedt A 2004International Journal of Production Economics2004,90,:1
12Multi-product econom- ic lot scheduling problem with manufacturing and remanufactur- ing using a basic period policy显示文摘Zanoni S Segerstedt A Tang O 2012Computers and Industrial En- gineerinng2012,62,4:1
13Multi-product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy 显示文摘Zanoni S Segerstedt A Tang O 2012Computers g< Industrial Engineering2012,62,4:1
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费