维普中文期刊产品整合服务

Overburden failure and the prevention of water and sand inrush during coal mining under thin bedrock

查看全文 作  者:Yang Weifeng Xia Xiaohong Zhao Guorong Ji Yubin Shen [1]Dingyi 高影响力作者 机构地区:[1]School of Resources and Geosdences, China University of Mining & Technology, Xuzhou 221116, China高影响力机构 出  处:《Mining Science and Technology》索引2011年第21卷第5期,共4页高影响力期刊 基  金:provided by the National Natural Science Foundation of China (No.40802076);the China Postdoctoral Science Foundation (No.20110491476) 摘  要:Coal mining under thin bedrock or thick unconsolidated soil layers brings mining problems related to these special geological conditions. The meaning of the term ''thin bedrock'' is defined through the thick- ness statistics of the coal seam and the bedrock layer. The coal-bearing strata having thick, unconsoli- dated aquifers and thin bedrock located at the Taiping Coal Mine in Shandong province were taken as a geological prototype for subsequent study. The geological, hydro-geological and engineering character- istics of the thin bedrock were analyzed. An engineering geological model was than established. Overbur- den failure and the development of ''Three Zones'' were studied by physical model tests. The rupture pattern and rock failure were analyzed for mining conditions under thin bedrock. The height of the caving zone and the freely flowing water fractured zone of different mining thicknesses were separately calcu- lated. The results show that a mining thickness greater than 3.5 m causes the height of the freely flowing water fractured zone to be sufficient to touch the weathered zone and the bottom of the Quaternary sys- tem aquifer, to various degrees. This, then, would lead to water and sand inrush into the working face. Measures to prevent water and sand flow inrush disasters by eliminating the power source are put fore- word. A field dewatering scheme was designed and observational data were obtained. The dewatering project had an obvious effect and the water level at working face number 8309 dropped to a safe level. The average draw down of the groundwater was observed to be 7.86 m. This showed that the dewatering project played a role in decreasing the hydraulic pressure and ensuring safety mining. 关 键 词:覆岩破坏 薄基岩 止水 松散含水层 裂隙带高度 采煤 煤炭开采 煤层厚度
相关文献

参考文献(19)

引证文献(7)

耦合文献(359)

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费