Key technologies for construction of Jinping traffic tunnel with an extremely deep overburden and a high water pressure

查看全文 作  者:Shougen CHEN Heng ZHANG Xinrong TAN Liang [1]CHEN 高影响力作者 机构地区:[1]School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China高影响力机构 出  处:《Journal of Modern Transportation》索引2011年第19卷第2期,共10页高影响力期刊 摘  要:Jinping traffic tunnel is one of the deepest traffic tunnels in the world with a maximum overburden of 2 375 m and the overburden over 73% of its total length is larger than 1 500 m.The tunnel is 17.5 km long and designed to provide a shortcut road between two hydropower stations:Jinping I and Jinping II of the Jinping Hydropower Project,located on Yalong River,Liangshan State,Sichuan Province,China.The tunnel is so deep that building any shafts is impossible.The construction starts from both ends(east and west ends),and the construction length from the west end is 10 km with a blind heading.This paper deals with an overview of this project and analysis of the engineering features,as well as key technologies developed and applied during the construction,including geological prediction,rock burst prevention under a super high in-situ stress,sealing of groundwater with a high pressure and big flow rate,ventilation for a blind heading of 10 km,wet spraying of shotcrete at zones of rock burst and rich water,etc.The application of the new technologies to the construction achieved a high quality tunnel within the contract period. 关 键 词:隧道施工 交通隧道 技术 深覆盖层 高水压 水电枢纽工程 工程特点 施工过程
相关文献

参考文献(11)

引证文献(6)

耦合文献(30)

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费